MEPCO New Connection: How to Apply

New electricity connections for MEPCO are applied for online through the Electricity New Connection (ENC) system. Here is the full path from application to meter installation.

Updated: · Facts checked against MEPCO, NEPRA and PITC sources

MEPCO New Connection: How to Apply
Quick answer: Apply on the official ENC portal, choose MEPCO, upload your CNIC, property proof and the other documents, then wait for the site survey. MEPCO issues a demand notice; pay it at the designated bank, submit the paid copy, and the meter is installed. Track every stage with your application tracking ID.

Documents you need

  • Applicant’s CNIC (front and back).
  • Proof of ownership: registry, allotment letter, fard or similar. Tenants need the owner’s NOC and a rent agreement.
  • CNIC copies of witnesses as asked in the form.
  • Reference number of a nearby existing connection (a neighbour’s bill), so the site can be located.
  • An affidavit on the format required, if asked.
  • For commercial or industrial loads: extra documents such as NTN and load details.

Keep scans clear and in colour. Most delays happen because a document is unreadable or the address doesn’t match the property papers.

Step-by-step application

  1. Open the ENC portal and select MEPCO as the company and the right connection type (domestic, commercial, etc.).
  2. Fill the form with your details, the load you need (kW) and the site address.
  3. Upload documents and submit. Note the tracking ID.
  4. Print the application if your sub-division asks for a hard copy.
  5. Site survey: MEPCO staff visit to check the location and load.
  6. Demand notice: after approval MEPCO issues a demand notice listing the connection charges and security deposit. Pay it at the designated bank.
  7. Submit the paid demand notice and complete any agreement/test report formalities.
  8. Meter installation: the meter is installed and your first bill follows in the next billing cycle.

Track your application

Use the tracking section of the ENC portal with your tracking ID or CNIC to see the stage: under review, survey, demand notice issued, paid, or installation. If a stage stays pending for long, visit the sub-division with your tracking ID.

Costs in the demand notice

The demand notice is the only official bill for a new connection. It usually includes the cost of service connection and material, and a security deposit linked to the sanctioned load. Pay only through the bank named on it. Never pay cash to anyone to “speed up” a meter.

Change of load or tariff

To increase or reduce the sanctioned load, or change tariff (for example opening a shop at home), apply through the same system as a change request. MEPCO notes that a load increase requires the security difference and any material cost, while a load reduction does not ask for the revised security. Name changes follow the same documentation as a new connection; see MEPCO name change.

After your meter is installed

Write down the reference number from your first bill and check your MEPCO bill online each month. If you plan rooftop solar, read MEPCO net metering first.

Frequently Asked Questions

How can I apply for a MEPCO new connection online?

Through the official Electricity New Connection (ENC) portal: select MEPCO, fill the form, upload your CNIC and property documents, and keep the tracking ID.

What is a demand notice?

It is the official charges notice MEPCO issues after approving your application. It lists the connection cost and security deposit, payable at the designated bank.

Can a tenant apply for a new connection?

Yes, usually with the owner's NOC and a rent agreement along with the tenant's CNIC.

How do I check my new connection status?

Use the tracking option on the ENC portal with your tracking ID or CNIC.